Rumaila Oil Field Development

Basra, Iraq
BP
2019-2023

Project Overview

World's third biggest producing field at 1.5 million barrels per day, delivering approximately one-third of Iraq's total oil supply. Operating since 1954 with 17 billion barrels of recoverable reserves.

1.5M
Barrels Per Day
17B
Recoverable Reserves (Barrels)
1954
Operational Since

Detailed Engineering Services for GRE Pipeline - Key Deliverables

Total Vision provided comprehensive engineering services for GRE Pipeline development:

Pipe wall thickness Calculations
Piping & Instrumentation Diagrams (P & IDs)
Pipeline Alignment Sheets
Piping Isometrics (including tie-in) and MTO estimation
General Arrangement Drawings (GADs) for support location and support detailing
Road crossing details
Datasheet, Material requisition (MRs) and Technical Bid Evaluation (TBE) for Valve and Pipe
Stress Analysis

Project Significance

The Rumaila Oil Field is one of the world's most significant petroleum assets, and Total Vision's contribution through comprehensive GRE Pipeline engineering services has been instrumental in maintaining and enhancing its operational capabilities. Our detailed engineering deliverables ensure the continued efficient and safe transportation of hydrocarbons from this critical field that supplies approximately one-third of Iraq's oil production.